(509) 821-2234

From Site to Move-In Ready

The Final
Polish.

Construction creates chaos. We create the finish. Specialized drywall dust extraction and HEPA-filtration cleaning that transforms your site into a home.

Industrial HEPA
Licensed & Bonded
Luxury post-construction cleaning in Spokane - HEPA-filtered dust extraction for new builds
Real-Time Verified Feedback

Verified Excellence.

Results Speak Louder Than Promises, Hundreds of verified reviews from clients who've experienced spotless results, white-glove attention to detail, and the peace of mind that comes with hiring the region's premier home cleaning professionals...

Spotless home interior in Spokane after professional post-construction cleaning and detailing
The Problem

Dust is the
Enemy of Craftsmanship.

You've spent months on your renovation or new build. But microscopic drywall dust is everywhere—inside cabinets, on light fixtures, and embedded in every crevice.

Standard cleaning tools just blow particles back into the air. We use industrial HEPA filtration and specialized techniques to bridge the gap between "Project Complete" and "Move-In Ready."

"Professional construction cleanup isn't just a luxury—it's the final stage of quality control."

Our System

The 3-Phase
Transformation.

Phase 01

The Debris Clear

Bulk material removal, wall-to-ceiling high-power vacuuming, and cabinet interior clearing. We remove the heavy layers first.

Phase 02

The Detail Scrub

Removal of paint overspray, adhesive residue, and stickers from fixtures. Intensive scrubbing of windows, tracks, and frames.

Phase 03

The Final Polish

HEPA air filtration run, micro-dusting of all surfaces, floor buffing, and a final Detailed & Professional white-glove inspection.

Technical Edge

Specialized
Methodology.

HEPA Filtration

Construction dust is fine enough to pass through standard filters. We use HEPA-certified vacuums that capture 99.97% of particulates.

Architectural Care

We use non-abrasive techniques to remove paint and glue from delicate modern finishes like quartz, hardwood, and bespoke fixtures.

Contractor-Trusted Standards

We handle the mess so you can handle the handover. Our standards meet the most demanding architectural requirements in Spokane.

Drywall Dust
Paint Residue
Sawdust
Adhesives
Builders FAQ

Frequently Asked
Questions.

What is phase-based construction cleaning?01

It's a systematic approach. Phase 1 is rough debris removal. Phase 2 is detailed scrubbing. Phase 3 is the final 'white glove' polish for move-in readiness.

Do you remove paint and glue residue?02

Yes. Our team is trained in specialized removal techniques for paint overspray, adhesive residue, and sticker removal without damaging delicate surfaces.

How long after construction should I clean?03

We recommend scheduling the final clean 24–48 hours after the last contractor leaves to allow all airborne dust to settle for extraction.

Do you offer window cleaning?04

Yes. Post-construction window cleaning (removing stickers, paint, and dust from tracks) is a standard part of our specialized scope.

Is the service insured?05

Absolutely. We carry comprehensive liability and workers' comp insurance specifically for site-based cleaning projects.

Do you handle small renovations too?06

Yes. Whether it's a single bathroom remodel or a 5,000 sq ft new build, we provide the same level of HEPA-filtered detail.

Our Guarantee

100% Satisfaction Guaranteed

Not completely thrilled with your cleaning? We'll return within 24 hours at no charge and make it perfect. That's the White Glove promise.

Verified & Backed by our reputation

Serving THE Region.

Specialized construction cleanup available across the Inland Northwest.

The Masterpiece
is Ready.

"Don't let dust dull your craftsmanship. Hire the specialized team that brings out the brilliance of your work."